top of page

PROJECTS

ANKARA-NIĞDE HIGHWAY ETUDE PROJECT ENGINEERING SERVICES
6.jpg

With in the scope of the project, a total of 330 kilometers alignment, including 275 kilometers of highway main route and 55 kilometers of connection roads; surveying, horizontal and vertical alignment design, creation of 1/5000, 1/1000 scaled plan-profiles, drainage project, hydraulic and hydrologic calculations ,soil investigation studies engineering services, viaducts, bridges, underpasses, overpasses, box culverts, and retaining wall projects, infrastructure displacement projects, landscaping projects, lighting projects, junction projects, link road projects ,structural design projects, fence projects, traffic safety projects, infrastructure projects and displacement-as built project services have been performed. Route Ankara, Kırşehir, Aksaray and Nevşehir provinces within the borders of the 2x3- lane Ankara-Niğde highway route, the traffic-open Ankara Perimeter Highway south of the District of Gölbaşı west of the Pilgrim Village begins. Following the west of the current State Road, the route crosses to the East, intersecting the State Road at Ahiboz Junction. It extends southwards from the region bounded by Salt Lake in the West and Hirfanlı Dam Lakes in the East. Aksaray-Kırşehir State Road (0757) Steppe Junction, Aksaray-Nevşehir State Road (0300) Alayhan Junction connection to the continuing route, the current Gölcük-2 Bridge Junction completed construction and opened to traffic Gölcük-Pozantı highway ends. Sections of the highway between Ankara and Niğde

(BURSA-KARACABEY)SEPARATION-ZEYTINBAĞI PROVINCIAL ROAD KM:0+000-10+500 AND GEBZE-ORHANGAZI-İZMIR MOTORWAY ,KM:117+260 TEKNOSAB INTERCHANGE ENGINEERING SERVICES WORK WITHIN THE SCOPE OF CONSTRUCTION PROJECT PHASE
2385881b404f4fcc8de1381e3fd60aa4.jpg

Within the scope of the project, mapping, soil investigation and related geotechnical design engineering services, design of 10.5 km route, design of 5 levelled intersections, design of 4 non-levelled interchanges, design of 7 bridges, design of Gebze-Orhangazi-İzmir Motorway connection road and related levelled interchanges including toll plaza are being designed.

SINOP-AYANCIK-15.BI.HD. ETUDE PROJECT ENGINEERING SERVICE
mavis_sinop_ayancik_karayolunu_aciyoruz_h5036.jpg

With in the scope of the project, approximately 48 kilometers of divided road route mapping, soil research engineering services, EIA, Engineering Services, study, corridor, horizontal and vertical alignment design, preparation of hydraulic and hydrologic study report, number of 22 levelled and non levelled interchange design, preliminary and final design of 1 bridge and 3 Tunnels, preparation of BOQ and final projects, drainage project, for the preparation of traffic safety projects services have been performed.

© 2019 by Kaan Vurdum Consulting. Proudly Created By B.V Design.

bottom of page